Asbestos-Cement Roof Replacement

Site-specific planning, careful removal and replacement roofing for commercial and industrial buildings.

ASBESTOS-CEMENT ROOFING

Planning starts with the building and the material condition

Every asbestos-cement roof project needs a site-specific plan covering the asbestos survey or register, sheet condition, roof build-up, access, fall protection, building occupancy, handling and waste arrangements.

HSE guidance explains that the material type, condition and work method determine whether work is non-licensed, notifiable non-licensed or licensable. All asbestos work requires a suitable risk assessment, trained people and appropriate controls.

The replacement roof can then be considered around the building, with profiled metal roofing, insulation, internal liners, rooflights and gutters included where they are appropriate to the project specification.

BEFORE A QUOTATION

Information that helps us review the roof

Useful information at the outset helps us understand the likely scope and identify what needs to be confirmed on site.

01

Survey or register

The current asbestos survey or register, including material type, location and condition where available.

02

Roof and building

Approximate roof area, current build-up, building use and any known internal constraints.

03

Access and occupancy

Site access, safe working areas, building occupancy and programme constraints.

04

Photos and drawings

Clear roof photographs, internal views and any drawings that help explain the existing construction.

REAL PROJECT PHOTOGRAPHY

Warehouse roof replacement in Newcastle upon Tyne

These site photographs document the work sequence from protection beneath the roof area through careful sheet handling, lowering, waste loading and the completed replacement roof.

Protection beneath the roof work area

Sheets removed carefully in complete lengths

Sheets stacked before lowering

Materials lowered to ground level

Sheets placed in the waste skip

Materials stacked to minimise breakage

PROJECT COMPLETION

Removal, replacement and completed roof

Replacement work in progress

Roof removal stage

Completed replacement roof

Planning an asbestos-cement roof replacement?

Send the site postcode, approximate roof area, asbestos survey or register if available, plus photographs and drawings. We can review the information and discuss the next step towards a quotation or site assessment.